Implementation of Label Cutting Workstations Improvement in The Jago Jaya Shuttlecock Industry to Increase Productivity Based on Ergonomic Aspects
Main Article Content
Jago Jaya Shuttlecock Industry is an MSME in Jagalan, Surakarta, that produces shuttlecocks. Based on these conditions, a study was conducted in 2020 by Sherlinta Kaban, which produced a label cutting tool tested on a label cutting workstation. However, in the trial, there are several obstacles found in using the label cutting tool, so follow-up study to analyze and improve the label cutting tools in previous studies to produce a new design that can be re-implemented. Ergonomics aspects used in this study are analysis of work posture using REBA, measurement of standard time with Westinghouse adjustments, the study of left and right-hand map movements, and tool redesign using the Reverse Engineering method. The improvements include implementing a new label cutting tool that can improve the operator's work posture, reduce standard time, increase the number of standard outputs, and improve operator hand movements to increase productivity at label cutting work stations.
Arianto, Bambang. “Pengembangan UMKM Digital Di Masa Pandemi Covid-19.” ATRABIS: Jurnal Administrasi Bisnis (e-Journal) 6, no. 2 (2020): 233–247.
Astuti, R.D., and I. Iftadi. Analisis Dan Perancangan Sistem Kerja. Deepublish, 2016. https://books.google.co.id/books?id=EUMyDwAAQBAJ.
Barnes, Ralph M. Motion and Time Study: Design and Measurement of Work. John Wiley \& Sons, 1991.
Dewi, Shanty Kusuma. “Pengukuran Efisiensi Proses Produksi Dengan Menggunakan Metode Data Envelopment Analysis (Dea).” Research Report (2016).
Ergoplus. “Step by Step Guides to Recommended Ergonomic Assessment Tools.”
Fitri, Annisa. “GAMBARAN TINGKAT RESIKO TERJADINYA GANGGUAN MUSKULOSKELETAL PADA PERAWAT SAAT MEMANDIKAN PASIEN DI RUANG ICU DR M. DJAMIL PADANG BERDASARKAN METODE RAPID ENTIRE BODY ASESSMENT (REBA) TAHUN 2020.” Universitas Andalas, 2020.
Kaban, Sherlinta Immanuella. “Usulan Rancangan Alat Bantu Pemotongan Label Shuttlecock Untuk Mengurangi Gerakan Berulang Pekerja Di Industri Jago Jaya Shuttlecock” (2020).
Kaban, Sherlinta Immanuella, Rahmaniyah Dwi Astuti, and Eko Pujiyanto. “Perancangan Alat Pemotong Label Untuk Meminimasi Gerakan Repetitive Pekerja Di Industri Jago Jaya Shuttlecock Surakarta.” Matrik: Jurnal Manajemen dan Teknik Industri Produksi 22, no. 1 (2021): 65–72.
Niebel, Benjamin W. “Motion and Time Study, Richard D. Irwin.” Inc., Homewood 111 (1988): 19553.
Nurmianto, E. “Ergonomi: Konsep Dasar Dan Aplikasinya. Kedua.” Surabaya: Guna Widya. Ratodi, M.(2015) Metode Perancangan Arsitektur. Surabaya (2008).
Prasojo, Tuwuh Wahyu, S T Ratnanto Fitriadi, and others. “Perancangan Ulang Mesin Pencacah Rumput Dengan Menggunakan Metode Reverse Engineering.” Universitas Muhammadiyah Surakarta, 2016.
Rahmawati, Desi. “Pengaruh Motivasi Terhadap Produktivitas Kerja Karyawan PR Fajar Berlian Tulungagung.” Jurnal Bonorowo 1, no. 1 (2013): 1–15.
Rinawati, Dyah Ika, Diana Puspita Sari, and Fatrin Muljadi. “Penentuan Waktu Standar Dan Jumlah Tenaga Kerja Optimal Pada Produksi Batik Cap (Studi Kasus: IKM Batik Saud Effendy, Laweyan).” J@ ti Undip: Jurnal Teknik Industri 7, no. 3 (2013): 143–150.
Susanti, Fitria. “Analisis Postur Kerja Sebagai Upaya Mengurangi Risiko Musculoskeletal Disorders Pada Karyawan Bagian Gudang Non Medis Rumah Sakit Kasih Ibu Surakarta” (2015).
Wiranda, Rizaldi. “PERANCANGAN ULANG ALAT PEMOTONG KERUPUK LOMANG MENGGUNAKAN METODE REVERSE ENGINEERING (RE)(STUDI KASUS: IKM KERUPUK LOMANG UBI WATI).” Universitas Islam Sultan Syarif Kasim Riau, 2020.